Id Detail of work Owner Name Scope of Work Cost (Rs.) Consultant Average works completed Remarks
1 Soil Investigation (29 Stories) including surveying, SPT testing @ 1.5 meter interval, undisturbed sampling, coring and Geo Technical reporting & Drilling works for High Rise Towers at DHA Phase-II Islamabad. DHA/Al-Ghurair Giga Soil Investigation & Drilling works. 5 million HALCROW UK 99%
2 Construction of Drainage Wells and Drilling works at Mangla for Mangla Dam Raising Project. WAPDA-CWE Construction of Drainage Wells and Drilling Works 105.657 million MJVL 50%
3 Constructions of Drainage Tubewells III in Mirpur Khas sub project area vide Contract No. T20NDI (B). WAPDA Drainage Tubewells in Mirpur Khas for WAPDA. 87 million Pakistan Drainage Co 99%
4 Pile Foundation Works Maple Leaf Cement Factory Mianwali Maple Leaf/DESCON Pile Foundation Works. 75.87 million NESPAK 97%
5 Pile Foundation Works for Dhan Gali Bridge WAPDA Pile Foundation Works. 17 million WAPDA 7%
6 Constructions of Tubewell No. 8/34 RL-I Islamabad CDA Constructions of Tubewell 1.5 million CDA 85%
7 Installation of 02 Nos. Tubewells including Conduction Line Chlorinate and construction of Pump Room in Model Village Humak Islamabad CDA Constructions of Tubewells 4.9 million CDA 95%
8 297 nos. of Pile Foundations Urban Developers / L Piles and Anchors 0 million Landmark 1%
9 Retaining Wall Piles for Proposed Rose Shopping Mall Rose Associates 140 Piles 0 million 70% Near Completion
10 Soil Investigation for Al-Qadir Heights Mr. Sheikh Waqar Drilling upto 50m, SPT & sampling, UDS, laboratory soil testing & Report writing 0 million Noor Durrani & Assoc 0%
11 Shoring/Retaining Piles & Anchoring works for Al-Qadir Heights, Garden Town, Lhr Waqar 150 Piles and 300 tie back anchors 20 million Rizwan & Associates 0%
12 900 nos. Piles at World Trade Centre, Islamabad for IJM, Malaysia Al-Gurair Giga Pvt. 750mm diameter 26.5m deep 0 million Alliance 0%
13 3,775 meters Piles at Al-Tuwairqi Steel Mill, Port Qasim Area Tuwairqi Steel Mills 3,775 meters Drilling/Piling of 1500 mm to 600 mm dia. piles 0 million Halcrow 0% Lenses of conglomerate, sandstone, silt, dense sandstone, claystone & dense sand.
14 Soil Investigation & Testing at Mailsi Syphon, Punjab Irrigation Dept. 4 no. Boreholes 0 million NESPAK 100%
15 14 Tower Foundations for Muzaffar Garh - Gatti 500 kva Transmission line River crossing at Head Trimmu, River Chenab NTDC/WAPDA 1200mm - 900mm dia Pile Foundations 35 meter - 25 meter deep 0 million BARQAAB 100% River Crossing Project
16 Soil Investigation for Dharab Lake Nespak 3 Boreholes for soil investigation 0 million Nespak 0% Rock Encountered
17 Soil investigation at proposed National Bank, The Mall, Lahore National Bank of Pak 03 Boreholes 0 million Nespak 0%
18 Soil Investigation for proposed Police Club and Welfare Center Bldg Inspector General of 06 Boreholes and 06 Test Pits 0 million Nespak 0%
19 87 Piles for DHA 1 Flyover DHA 1 / Habib Rafiq 30-35 meter depth, 30" dia. boreholes 0 million Meinhardt 0%
20 Piles at Fatima Chemical Plant & Ferti lizer including 850 tons Pile Load Test Fatima Fertilizer & 600 nos. Piles, 1000mm and 660mm dia. 0 million Nespak 0% Quantity of Piles reduced by designer
21 168 nos. Piles at Qaddafi stadium for construction of Raised Pavillions Pakistan Cricket Boa 24" dia. Piles, 85 ft. depth 0 million Nespak 0% Project completed before time
 