| Description of Work |
Client/Consultant |
| Survey & Construction of Piling works at Maple Leaf Cement Factory Iskanderabad, Mianwali 473 nos. of Piles. |
DESCON/M.L.C.F., Nespak |
| Survey & Construction of 576 Nos. piles of 24" & 30" dia upto the depth of 45.75 & 82 ft. each at under pass Jail Road Bridge Canal Crossing, Lahore & Feozepur Road Canal Crossing, Lahore |
LDA/ NESPAK |
| Survey & Construction of Piling works for section 1 CH (O-35 KM) Six Lane Limited Access Motorway Lahore Islamabad, 664 nos. of Piles.1 Meter Dia |
M/s. Daewoo Pakistan |
| Transmission Arrangement for Power Dispersal of Ghazi Barotha Hydro Power Project Contract No. 2017-16 (Section-II) Construction of Mandi Bahauddin-Lahore 500 KV T line Survey, Design & Construction of piling work for 500 KV Rewat-Ghakhar Lahore T/Line at Khanki Headwork Dia 1.2 meters Length 44 meters. |
Greaves Potential/Nespak |
| Survey and Construction of 199 Nos RCC piles, Beans and Pile caps for Central Telecommunication Bldgs Lahore. |
P.W.D |
| Survey and Construction of 317 RCC Piles for Pak Arab Fertilizer Complex, Multan. |
Pak Arab Fertilizer |
| Survey & Construction of 126 Nos RCC piles for ICI polymer plant Sheikhpura. |
ICI |
| Survey & Construction of 267 RCC piles for ICI polymer Plant, Sheikhpura. |
ICI |
| Survey, and construction of 40 RCC Piles. |
Defence Deptt. |
| Survey & Construction of RCC pile Foundation for Tower location No. 164 132 KV double Circuit Kot Addu D.I. Khan transmission Line. |
GSC-WAPDA |
| Survey & Construction of 85 Nos RCC piles at Nasir Glassic Project, Sheikhupura. |
Nasir Siddique Corp. Pvt. Ltd |
| Survey & Construction of RCC pile foundation 132 KV Transmission line at Ghazighet (Group-6). |
GSC-WAPDA |
| Survey &Construction of RCC pile foundation 132 KV Transmission line at Ghazighet |
GSC-WAPDA |
| |
|
|
| Description of Work |
Client |
| Exploratory Drilling (Coring) Work at Shilman. |
Pakistan Atomic Energy Commission. |
| Sub-surface Exploration (Coring) & Geo-technical Investigation at Kala Bagh Dam. |
WAPDA. |
| Hydro Geological Investigation (Coring) for Gandaf Irrigation Tunnel Tarbela Dam. |
WAPDA. |
| Soil Investigation (Coring) at River Channel at Kalabagh Dam SITE. |
WAPDA. |
| Subsurface Investigation (Coring) for Tarbela Hydro extension Project Tarbela Dam. |
WAPDA. |
| Land & River Channel Soil Investigation (Coring) at Kalabagh Dam Project. |
WAPDA. |
| Soil Investigation & Exploratory Drilling (Non-Coring) work for 45 MW ABB Alsthom Project, Mangla. |
ABB Alsthom. |
| Soil Investigation (Coring) at Malakand Hydropower Project III at Tunnel No. 2 & 5. |
CWE. |
| Soil Investigation (Coring), Angular Drilling upto 320’ depth at Simly Dam, Islamabad. |
CDA/WAPDA. |
| Soil Investigation including surveying, SPT testing @ 1.5 meter interval, undisturbed sampling and Geo Technical reporting & Drilling works for Gold Crest High Rise Towers at DHA Phase-II Islamabad. |
Al-Ghurair Giga Pvt Ltd. |
| Description of Work |
Number of Tubewells |
Contract Value in Million Rs |
Contracting Authority |
| Contract No. SBR 400-100 Right Bank FGW Project. |
100 |
12.1 |
Project Director LVR Drainage Project Stage-II WAPDA Lahore. |
| Contract No. 2-111 Shah Pur Scarp Unit-II |
66 |
7.4 |
Project Director Sargodha. |
| Contract No. 6-102 Punjnad Section of Allahabad Pilot Project. |
380 |
42.8 |
GM (Water) North Lahore Project Director Scarp V Punjnad Rahim Yar Khan. |
| Contract No. V-116 Satiana Pilot Project L.R.S.V. |
71 |
9.1 |
Chief Engineer (Water) Faisalabad. |
| Contract No. 2-177 Chann Village and Adikot Village Schemes. |
18 |
3.6 |
Project Director WAPDA Sargodha. |
| Contract No. 2-116 Scrap II in Chuj Dhoab |
17 |
2.4 |
Project Director WAPDA Sargodha |
| Contract No. 7-702 Minchinabad Pilot Project Phase-II |
126 |
12 |
Chief Engineer (Water) Rahim Yar Khan. |
| Scrap North Rohri and Scrap Khir Pur. |
38 |
3 |
Project Director Scrap Project South Rorhi (FCW). |
| Water Supply Scheme Mardan NWFP |
10 |
1 |
Public Health Engr. Deptt. Mardan NWFP. |
| Construction of Tubewells and appurtenant works. |
6 |
0.7 |
Pak Saudi Fertilizer Company. |
| Installation of 3 Nos. of tubewells of 4-cfs capacity and allied works at Qilla Gujjar Singh, University sports Complex Lahore. |
3 |
-- |
WASA/LDA Lahore. |
| Installation of 3 Nos. of 4-cfs capacity tubewells and allied works at Nila Gumbad Lahore. |
4 |
-- |
WASA/LDA Lahore. |
| Installation of 4-cfs tubewells at Jail Road Lahore. |
4 |
-- |
WASA/LDA Lahore |
| Construction and Installation of 4 Nos. tubwells at various locations at Lahore. |
4 |
-- |
WASA/LDA Lahore. |
| Installation of 4 Nos. of tubewells having 4 cfs capacity with allied works at different locations of Lahore. |
4 |
-- |
WASA/LDA Lahore. |
| 220 Tubewells in Central Sanghar LBOD WAPDA Project. |
220 |
100 |
LBOD WAPDA Sanghar. |
| Construction of 250 nos of drainage Tubewells-III in Mirpurkhas |
250 |
73.832 |
Project Director WAPDA (WS) Hyderabad |