Services
Pile Foundation
Soil Investigation
Grouting/Piezometers
Tubewell Construction
Oil & Gas Equipment
Equipment Rental
View Completed Projects of Pile Foundation
View Completed Projects of Soil Investigation/Core Drilling/Grouting
View Completed Projects of Tubewells Work


Completed Projects of Pile Foundation

Description of Work Client/Consultant
Survey & Construction of Piling works at Maple Leaf Cement Factory Iskanderabad, Mianwali 473 nos. of Piles. DESCON/M.L.C.F., Nespak
Survey & Construction of 576 Nos. piles of 24" & 30" dia upto the depth of 45.75 & 82 ft. each at under pass Jail Road Bridge Canal Crossing, Lahore & Feozepur Road Canal Crossing, Lahore LDA/ NESPAK
Survey & Construction of Piling works for section 1 CH (O-35 KM) Six Lane Limited Access Motorway Lahore Islamabad, 664 nos. of Piles.1 Meter Dia M/s. Daewoo Pakistan
Transmission Arrangement for Power Dispersal of Ghazi Barotha Hydro Power Project Contract No. 2017-16 (Section-II) Construction of Mandi Bahauddin-Lahore 500 KV T line Survey, Design & Construction of piling work for 500 KV Rewat-Ghakhar Lahore T/Line at Khanki Headwork Dia 1.2 meters Length 44 meters. Greaves Potential/Nespak
Survey and Construction of 199 Nos RCC piles, Beans and Pile caps for Central Telecommunication Bldgs Lahore. P.W.D
Survey and Construction of 317 RCC Piles for Pak Arab Fertilizer Complex, Multan. Pak Arab Fertilizer
Survey & Construction of 126 Nos RCC piles for ICI polymer plant Sheikhpura. ICI
Survey & Construction of 267 RCC piles for ICI polymer Plant, Sheikhpura. ICI
Survey, and construction of 40 RCC Piles. Defence Deptt.
Survey & Construction of RCC pile Foundation for Tower location No. 164 132 KV double Circuit Kot Addu D.I. Khan transmission Line. GSC-WAPDA
Survey & Construction of 85 Nos RCC piles at Nasir Glassic Project, Sheikhupura. Nasir Siddique Corp. Pvt. Ltd
Survey & Construction of RCC pile foundation 132 KV Transmission line at Ghazighet (Group-6). GSC-WAPDA
Survey &Construction of RCC pile foundation 132 KV Transmission line at Ghazighet GSC-WAPDA


Completed Projects of Soil Investigation/Core Drilling/Grouting

Description of Work Client
Exploratory Drilling (Coring) Work at Shilman. Pakistan Atomic Energy Commission.
Sub-surface Exploration (Coring) & Geo-technical Investigation at Kala Bagh Dam. WAPDA.
Hydro Geological Investigation (Coring) for Gandaf Irrigation Tunnel Tarbela Dam. WAPDA.
Soil Investigation (Coring) at River Channel at Kalabagh Dam SITE. WAPDA.
Subsurface Investigation (Coring) for Tarbela Hydro extension Project Tarbela Dam. WAPDA.
Land & River Channel Soil Investigation (Coring) at Kalabagh Dam Project. WAPDA.
Soil Investigation & Exploratory Drilling (Non-Coring) work for 45 MW ABB Alsthom Project, Mangla. ABB Alsthom.
Soil Investigation (Coring) at Malakand Hydropower Project III at Tunnel No. 2 & 5. CWE.
Soil Investigation (Coring), Angular Drilling upto 320’ depth at Simly Dam, Islamabad. CDA/WAPDA.
Soil Investigation including surveying, SPT testing @ 1.5 meter interval, undisturbed sampling and Geo Technical reporting & Drilling works for Gold Crest High Rise Towers at DHA Phase-II Islamabad. Al-Ghurair Giga Pvt Ltd.


Completed Projects of Tubewells Work

Description of Work Number of Tubewells Contract Value in Million Rs Contracting Authority
Contract No. SBR 400-100 Right Bank FGW Project. 100 12.1 Project Director LVR Drainage Project Stage-II WAPDA Lahore.
Contract No. 2-111 Shah Pur Scarp Unit-II 66 7.4 Project Director Sargodha.
Contract No. 6-102 Punjnad Section of Allahabad Pilot Project. 380 42.8 GM (Water) North Lahore Project Director Scarp V Punjnad Rahim Yar Khan.
Contract No. V-116 Satiana Pilot Project L.R.S.V. 71 9.1 Chief Engineer (Water) Faisalabad.
Contract No. 2-177 Chann Village and Adikot Village Schemes. 18 3.6 Project Director WAPDA Sargodha.
Contract No. 2-116 Scrap II in Chuj Dhoab 17 2.4 Project Director WAPDA Sargodha
Contract No. 7-702 Minchinabad Pilot Project Phase-II 126 12 Chief Engineer (Water) Rahim Yar Khan.
Scrap North Rohri and Scrap Khir Pur. 38 3 Project Director Scrap Project South Rorhi (FCW).
Water Supply Scheme Mardan NWFP 10 1 Public Health Engr. Deptt. Mardan NWFP.
Construction of Tubewells and appurtenant works. 6 0.7 Pak Saudi Fertilizer Company.
Installation of 3 Nos. of tubewells of 4-cfs capacity and allied works at Qilla Gujjar Singh, University sports Complex Lahore. 3 -- WASA/LDA Lahore.
Installation of 3 Nos. of 4-cfs capacity tubewells and allied works at Nila Gumbad Lahore. 4 -- WASA/LDA Lahore.
Installation of 4-cfs tubewells at Jail Road Lahore. 4 -- WASA/LDA Lahore
Construction and Installation of 4 Nos. tubwells at various locations at Lahore. 4 -- WASA/LDA Lahore.
Installation of 4 Nos. of tubewells having 4 cfs capacity with allied works at different locations of Lahore. 4 -- WASA/LDA Lahore.
220 Tubewells in Central Sanghar LBOD WAPDA Project. 220 100 LBOD WAPDA Sanghar.
Construction of 250 nos of drainage Tubewells-III in Mirpurkhas 250 73.832 Project Director WAPDA (WS) Hyderabad

 

 

 
© Deepwell Corporation (PVT) Ltd. All rights reserved.
Webhosting, design and maintenance by Uraan, Inc